1. If the user's equipments need to be connected to the waterway, circuit, etc. of SSRF, please contact the person on duty of the process group.
2. SSRF implements the 3-phase 5-wire system, and the zero wire and ground wire inside the equipment cannot be connected.
3. Generally, the plug of the power strip is 10A, so the maximum power capacity is about 2kW, and it cannot work for a long time at 2kW power. It is best not to connect multiple power strips in series for long-time use.
4. Please ensure the safety of the equipments. Be careful when installing and operating the user’s equipments at the experimental station to avoid causing faults of the beamline’s equipments and affecting the normal operation.